Shenzhen Government Online
Public Place Sanitation Permit (new permit, including for reconstruction and expansion-notification commitment system)
From: Shenzhen Municipal Health Commission
Updated: 2021-03-26 15:03

Basic information

Item

Public Place Sanitation

Permit (new permit,

including for

reconstruction and

expansion- notification

commitment system)

Online appointment

http://wsbs.sz.gov.cn/rmpc/yy/region

Commitment time frame

1 working day

Online processing

http://wsbs.sz.gov.cn/apply/ui/MB2C9219X3440120017001440300

Processing options

Online processing,

window processing,

courier application for

processing




Acceptance criteria

Who are eligible: corporate entities,public entities


Conditions for processing

Public places eligible for acceptance include:

1. Places of accommodation: places that provide accommodation and related services to consumers, including hotels, inns, guest houses, resorts, hostels, and hotel-style apartment complexes, providing guests with public hygiene products and utensils.

2. Bathing facilities: public bathhouses engaged in operating services, including bathing pools, bathing rooms, spa bathhouses, foot massage bathhouses. Sauna facilities are not included.

3. Beauty and hairdressing places: (i) Beauty salons: places that provide non-invasive skin cleansing, care, maintenance and grooming services using techniques, equipment and products such as makeup and beauty care. Beauty salons include beauty stores, beauty centers, beauty salons, skin care salons, and beauty spa salons. Nail stores, medical aesthetics, weight-loss massage salons, and health-care massage salons are not included; (ii) Hairdressing establishments: establishments that provide hair styling, trimming, hair care and perming services, using techniques, equipment and products such as shampoo, hair care, coloring and perming products. They include barber shops, hairdressers, hairdressing shops, hair cutting shops, perming shops, hairdressing salons, and hair design centers. Mobile haircutting stalls are not included.

4. Sports venues, excluding fitness rooms. Among them, swimming venues refer to indoor and outdoor water surfaces (areas), and their facilities and equipment that provide swimming for fitness, training, competition, and recreational activities. They include indoor and outdoor artificial swimming pools, stadiums and other swimming venues. 

5. Shopping malls (stores), supermarkets, bookstores with centralized air conditioning. Professional markets, farmers’ markets, counter (stall) stand-alone shopping malls are not included.

6. Centralized air conditioning and ventilation system refers to all the equipment, piping, accessories, instruments and meters for the centralized treatment, transport and distribution of air in order to make the air temperature, humidity, cleanliness, airflow speed and other parameters in a room or closed space meet the set requirements. 


Offline processing procedure

Application

1. The applicant shall make an on-site application in the Shenzhen Civic Center Administrative Service Hall;

2. The applicant will be guided to the self-service area;

3. The applicant shall make an application after reading the guidelines;

4. A service number will be generated;

5. The applicant shall submit the materials to the service window on the spot or by mail.


Acceptance (on the spot)

1. Where the application materials are found incomplete or non-conforming with the statutory form, a One-time Notification will be issued;

2. Applicants shall make corrections in accordance with the One-time Notification before resubmitting the application to the window on the spot or by mail;

3. Where the application materials do not comply with the requirements of acceptance, a Notification of Non-acceptance will be issued;

4. Where the application materials cannot be determined as incomplete or non-conforming with the statutory form, the handling personnel will issue a Notice of Pre-receipt, a Notice of Receipt or a Notice of Acceptance.


Examination(on the spot)

Approval(on the spot)

1. If the application is not approved, the processing procedure will be concluded by issuing a Letter of Decision to deny administrative licensing on the spot ;

2. If the application is approved, the processing procedure will be concluded by issuing a Letter of Approval on the spot.


Conclusion (on the spot)

The approval authority will produce the administrative license and transfer it to the certificate claim window.

License collection

The applicant can claim the administrative license from the service window or by mail.


Application materials

The list of materialsrequired includes 12 documents.

There is no need to bring original documents if materials are marked as exemption from submission.


1. Application form for sanitation permit

Original document: 1

Photocopy: 0

Paper/electronic

Material type: application

form

Material form: paper /

electronic

2. Regulations on the Administration of Sanitation

in Public Places

Original document: 1

Photocopy: 0

Paper/electronic

Material type: other

Material form: paper /

electronic

3. Floor plan of the sanitary facility

Original document: 1

Photocopy: 0

Paper/electronic

Material type: other

Material form: paper /

electronic

4. Documentary proof that the person handling the

application has been authorized by the applicant or

the legal person

Original document: 1

Photocopy: 0

Paper/electronic

Material type: other

Material form: paper /

electronic

Material size: A4

5. Letter of Notification and Commitment of Public

Place Sanitation Permit

Original document: 2

Photocopy: 0

Paper/electronic

Material type: other

Material form: paper / electronic

Material size: A4

6. Health certificates of the practitioners

Original document: 0

Photocopy: 1

Paper/electronic


Exemption from submission

7. Resident ID card

Original document: 1

Photocopy: 0

Paper/electronic

Material type: certificate

Material form: paper / electronic

Material size: A4

8. Address and orientation plan of the public place

Original document: 1

Photocopy: 0

Paper/electronic

Material type: other

Material form: paper / electronic

Material size: A4

9. Public place sanitation testing report (including

evaluation) within a year (limited to accommodations with more than 50 rooms, swimming places, and 

places with centralized air conditioning and ventilation

systems)

Original document: 1

Photocopy: 0

Paper



Exemption from submission

10. Sanitary inspection report or evaluation report of

centralized air-conditioning ventilation system

Original document: 1

Photocopy: 0

Paper/electronic


Exemption from submission

11. List of practitioners

Original document: 1

Photocopy: 0

Paper/electronic


Exemption from submission

12. Certificate of the public entity legal person

Original document: 1

Photocopy: 0

Paper

Material type: certificate

Material form: paper

Material size: A4


Service window

Comprehensive Service Window of West Hall of Shenzhen Administrative Service Hall

Add:Shenzhen Civic Center, Fuzhong Road 3, Futian District, Shenzhen

Tel: 0755-88125844, 0755-88127282

Office hours: 9 a.m.-12 p.m., 2-5:45 p.m., Monday to Friday (except national statutory holidays)

Buses:

1.38, 60, 64, 107, 235, 236, 374, 398, B686, E18, K578, M262, M390, N9, Civic Center Stop (市民中心站)

2.38, 60, 64, 76 Interval Line, 235, 371, 373, 374, 398, B709, M347, M390, N9, Peak-time Bus 4, Civic Center East Stop 

Metro: Line 2 or Line 4, Civic Center Station



-